OPEN NATIONAL INVITATION TO TENDER N°……..029./ONIT/NWRTB/GOV-NW/2026 OF ……17. /…11…. /2026 FOR  THE REHABILITATION OF TWO STRETCH OF ROADS IN MBENGWI COUNCIL AREA, MOMO DIVISION, NORTHWEST REGION BY EMERGENCY PROCEDURE LOT01 :THE REHABILITATION OF BAREKE-WUMNEBIT-CHENAM IN MBENGWI COUNCIL AREA, MOMO DIVISION, NORTHWEST REGION AND LOT 02: THE REHABILITATION OF THE ROAD STRETCH KOBENYANG (R0514) BOSSA-TUGUN-INTER R0514.
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

Within the framework of Construction/Reconstruction of Engineering Structures, the Delegated Contracting Authority hereby launches an Open National Invitation to tender for the

REHABILITATION OF TWO STRETCH OF ROADS IN MBENGWI COUNCIL, NORTHWEST REGION BY EMERGENCY PROCEDURE

LOT 01: THE REHABILITATION OF BAREKWE-WUMNEBIT-CHENAM 6.5KM IN MBENGWI COUNCIL AREA, MOMO DIVISION, NORTHWEST REGION AND

LOT 02: THE REHABILITATION OF THE ROAD STRETCH KOBENYANG (R0514) BOSSA-TUGUN-INTER R0514 NORTHWEST REGION 19.5KM

Works comprise especially the items listed in the table below:

Stretch 1: REHABILITATION OF BAREKWE-WUMNEBIT-CHENAM 6.5KM                                   

Stretch 2: REHABILITATION DE LA ROUTE KOBENYAN(R0514)-BOSSA -TUGUN INTER R0514 19.5KM

 

Item No.

Description of Works

Unit

TM001

Site installation

Lump sum

TM002

Mobilisation and demobilisation of equipment

Lump sum

TM101

Bush clearing

m²

TM103

Tree felling

No.

TM103b

Clearing using a bulldozer

km

TM106a

Rock excavation and disposal

m³

TM108a

Borrow-pit fill

m³

TM110

Rapid grading

m²

TM112

Reshaping and compaction

m²

TM114a

Formation of earth drains and diversion channels using a grader

linear m

TM117

Additional haulage cost for items  106, 108, and 114 for distances greater than 5 km

m³ × km

TM301

Cleaning of culverts and box culverts with height below 1.5 m

No.

TM302

Cleaning of bridges and small bridges

No.

TM307a

Supply and installation of 800 mm diameter metal culvert pipe

linear m

TM309a

Masonry inlet chambers for 800 mm diameter culvert pipes

No.

TM310a

Masonry headwalls for 800 mm diameter culvert pipes

No.

TM401a

Reinforced-concrete box culvert, 1.5 × 1.0 m

linear m

TM402b

Reinforced-concrete box culvert headwall, 1.5 × 1.0 m

No.

TM423f

Concrete with a cement dosage of 400 kg/m³

m³

TM417

Masonry stonework

m²

TM313

Masonry drains, 130 × 65 cm

linear m

TM528a

Supply and installation of wooden marker posts

No.

TM517a

Type AB metal traffic signs

No.

TM601

Construction of rainy-season barriers

No.

TM613

Management of rainy-season barriers

No. × month

2.Consistance des prestations New(Additif)

 

Item No.

Description of Works

Unit

TM001

Site installation

Lump sum

TM002

Mobilisation and demobilisation of equipment

Lump sum

TM101

Bush clearing

m²

TM103

Tree felling

No.

TM103b

Clearing using a bulldozer

km

TM106a

Rock excavation and disposal

m³

TM108a

Borrow-pit fill

m³

TM110

Rapid grading

m²

TM112

Reshaping and compaction

m²

TM114a

Formation of earth drains and diversion channels using a grader

linear m

TM117

Additional haulage cost for items  106, 108, and 114 for distances greater than 5 km

m³ × km

TM301

Cleaning of culverts and box culverts with height below 1.5 m

No.

TM302

Cleaning of bridges and small bridges

No.

TM307a

Supply and installation of 800 mm diameter metal culvert pipe

linear m

TM309a

Masonry inlet chambers for 800 mm diameter culvert pipes

No.

TM310a

Masonry headwalls for 800 mm diameter culvert pipes

No.

TM401a

Reinforced-concrete box culvert, 1.5 × 1.0 m

linear m

TM402b

Reinforced-concrete box culvert headwall, 1.5 × 1.0 m

No.

TM423f

Concrete with a cement dosage of 400 kg/m³

m³

TM417

Masonry stonework

m²

TM313

Masonry drains, 130 × 65 cm

linear m

TM528a

Supply and installation of wooden marker posts

No.

TM517a

Type AB metal traffic signs

No.

TM601

Construction of rainy-season barriers

No.

TM613

Management of rainy-season barriers

No. × month

3.Cout Prévisionnel New(Additif)

LOTS

Project Name

Type  of Structure

Span (km)

Estimated Cost including (TTC) in FCFA

1

REHABILITATION OF TWO STRETCH OF ROADS, THE REHABILITATION OF BAREKWE-WUMNEBIT -CHENAM 6.5KM IN MBENGWI COUNCIL AREA , MOMO DIVISION

 

 

ROAD

6.5 KM

78 500 000

2

THE REHABILITATION OF THE ROAD STRETCH KOBENYANG (R0514) BOSSA-TUGUN-INTER R0514 IN MBENGWI COUNCIL AREA , MOMO DIVISION

ROAD

19.5 KM

188 000 000

 

The estimated cost of the operation following preliminary studies for lot 01 is 78 500 000 (seventy eight million five hundred thousands) and for lot 02 is 188 000 000 (one hundred and eighty-eight million)CFA all taxes included.

4.Allotissement New(Additif)

LOTS

Project Name

1

REHABILITATION OF TWO STRETCH OF ROADS, THE REHABILITATION OF BAREKWE-WUMNEBIT -CHENAM 6.5KM IN MBENGWI COUNCIL AREA , MOMO DIVISION

2

THE REHABILITATION OF THE ROAD STRETCH KOBENYANG (R0514) BOSSA-TUGUN-INTER R0514 IN MBENGWI COUNCIL AREA , MOMO DIVISION

5.Participation et origine New(Additif)

1.   Participation And Origin Of Bidders:

Participation in this invitation to tender is open to all registered, categorised and qualified companies or groups of companies based in the Republic of Cameroon.

6.Financement New(Additif)

The Works on this tender are funded by  MINTP BUDGET 2026 AND BEYOND , IMPUTATION nO   : 36 371 1 32000008 0451 523511

7.Consultation du Dossier New(Additif)

The hard copy of the file may be consulted free of charge during working hours in the services of the Delegated Contracting Authority -  the office of the Governor of the Northwest region premises as soon as this notice is published. It may equally be consulted online on the COLEPS platform at the following addresses: http://www.marchespublics.cm and http://www.publiccontracts.cm on the ARMP website (www.armp.cm)

 

8.Acquisition du Dossier New(Additif)

This receipt should be able to identify the buyer as the representative of the bidder, wishing to participate in the consultation.  

 The hard copy of the Tender file may be obtained from the office of the Governor of the Northwest region premises as soon as this notice is published against payment of a non-refundable sum of One Hundred and thirty six Thousand (136,000) Francs CFA , payable at the Regional Treasury.

During the acquisition of the tender file, the bidder will fill in the register indicating his complete address (PO Box, Telephone number, fax, Email).

It is equally possible to obtain the electronic version of the Tender File by downloading it free of charge through the addresses indicated above. However, online submission is subject to the payment of Tender File purchase fees. 

9.Remises des offres New(Additif)

Each offer drafted in English or French will be submitted online in the MINMAP/COLEPS platform www.publiccontracts.com not later than_____/_____/2026 at 11 AM local time. A backup copy of the Tender saved in a USB key or a CD/DVD must be sent in a sealed envelope with a clear and legible indication “backup copy” within the time limit and should carry the inscription

 

OPEN NATIONAL INVITATION TO TENDER

N°…….../ONIT/NWRTB/GOV-NW/2026 OF ……. /……. /2026 FOR THE REHABILITATION OF TWO STRETCH OF ROADS IN MBENGWI COUNCIL AREA,MOMO Division NORTHWEST REGION BY EMERGENCY PROCEDURE

,LOT01 :THE REHABILITATION OF BAREKWE-WUMNEBIT-CHENAM 6.5KM  IN MBENGWI COUNCIL NORTHWEST REGION AND

LOT 02: THE REHABILITATION OF THE ROAD STRETCH KOBENYANG (R0514) BOSSA-TUGUN-INTER R0514. 19.5km

To be opened only during session

<>

Size and Format of Files

The maximum size of the different volumes cited above (Volume 1, Volume 2 and Volume 3) or the files to transmit through the platform and make up the tender file of the bidder are as follows:

·          5MB for Administrative documents(Volume 1)

·          15MB for Technical offer(Volume 2)

·          5MB for Financial documents(Volume 3)

The accepted formats are the following:

·          PDF Format for documents

·          JPEG for images

The bidder will have to use compression software to reduce the sizes of each volume to fall in line with the specifications.

10.Delai de Livraison New(Additif)

 The maximum time frame provided for by the Delegated Contracting Authority for the execution of works subject of this open national invitation to tender is six (06) calendar months. This time frame shall run from the date of notification of the administrative order to commence the services.

11.Cautionnement Provisoire New(Additif)

1.   BID BOND (TENDER GUARANTEE) :

Each bidder must include in his administrative documents, a bid bond in line with the prescription of Caisse des Depots et Consignations (CDEC) approved by the Ministry in charge of finance and whose list is found in this Consultation File,  and valid for ninety (90) days beyond the date of validity of bids. The amount of the bid bond is indicated in the table below:

 

No

Amount in Figures(FCFA)

Amount in Words(FCFA)

Lot 01

200 000

Two HUNDRED THOUSAND

Lot 02

500 000

Five hundred thousand

 

To avoid reject, the bid bond has to be an original copy which is less than three months.

The bid bond will released for unsuccessful bidders once the publication of the award is done. In case the bidder is attributed the contract, the bid bond will be released only when the final bond has been produced. Bank cheques (even certified) will not be accepted in place of the bid bond. The Bid bond will be validated by a receipt of deposit at CDEC.

12.Recevabilité des Offres New(Additif)

Bids that will be submitted after the date and time mentioned above or those that will not respect the separation model indicated in the different documents in each bid shall not be accepted.

All the bids that are not conform to the prescriptions of this tender file shall not be accepted.

The absence of the stamped bid bond drawn up using the model proposed in the tender file and issued by a bank or an insurance company accredited to issue bonds within the framework of public contracts, valid within Ninety (90) days.

To avoid being rejected, the required Administrative documents will be imperatively produced in original or in certified true copies by the issuing service, in conformity with the stipulation of the rules and regulations of this tender.

These Administrative documents have a validity period of three (03) months. This validity period has to begin after the date of the launching of the tender.

13.Ouverture des Plis New(Additif)

The bids shall be opened in a single phase. The opening of the administrative documents, the Technical and Financial offers will take place online in the MINMAP/COLEPS platform www.publiccontracts.com on the_____/______/2026 at 12 noon local time, in the conference hall of the Regional Tenders’ Board, by its competent Members. Only bidders may attend or be represented by duly mandated persons of their choice who has a perfect mastery of the tender file. The bids will be evaluated exclusively of value added tax (EVAT) and all taxes inclusive (ATI) and accompanied by a signed model submission

 

To avoid being rejected, the required Administrative documents will be imperatively produced in original or in certified true copies by the issuing service, in conformity with the stipulation of the rules and regulations of this tender. These Administrative documents have a validity period of three (03) months. This validity period has to begin after the date of the launching of the tender.

In case of absence or non-conformity of an administrative document during the opening session, after a deadline of 48 hours given by the commission, the offer will be rejected.

14.Critères d'évaluation New(Additif)

1.   MAIN CRITERIA OF EVALUATION OF THE BIDS :

16-1- : ELIMINATORY CRITERIA:

A-Administrative Documents

a)    Absence during bid opening session the original copy of bid bond issued by a first-class financial organisation authorized by the Ministry of Finance to issue Bid Bonds within the framework of public Contracts;

b)    Non-conformity after a period of 48 hours following the deposit of bids, of at least one Administrative document;

B-Technical Documents

a)     Absence of the declaration by the bidder attesting that the latter has not abandoned any contract within the last three (03) years, and that he does not future in in the list of non-performant companies established by MINMAP.

b)     Absence of integrity chart dated and signed.

c)     Absence of declaration on the engagement to respect environmental clauses;

d)     Absence of financial capacity drafted with respect to the COBAC model issued by first class bank approved by the Minister of Finance;

LOT

Amount in figures Fcfa

Amount in Words Fcfa

1

30,000,000

thirty Million

2

90,000,000

ninety Million

 

e)     Did not validate 2/3 of the essential criteria and obligatorily the equipment criteria;

f)      Did not have the minimum required equipment

·         Grader

·         Water tanker

·         An excavator

·         Bulldozer

·         Big compactor

·         04 dump Truck

·         Two(02) concrete Mixers

·         Two(02) concrete Vibrators

·         Two(01) manual compactors

·         A Pick Up 4 x 4

g)     Absence of attestation of site visit dated, stamped and signed by the bidder;

h)     Absence of categorization certificate issued by MINMAP

i)      Proof of acceptance of clauses within the contract

C-Incomplete financial bid for absence of one of the following documents:

a)     Unit Price breakdown non-conform with that of the tender file ;

b)     The unit price schedule non-conform with that of the tender file;

c)     Absence of a quantified price in the financial offer;

d)     Absence of an element in the financial offer(the tender letter, the Unit Price Schedule, the Bill of Quantities and cost Estimates.

D-General Eliminatory Criteria:

a)     Absence of the soft copy of the bid or non -respect of the format for the files

b)     Absence of original copy of bid bond

c)     False declaration, falsified documents or non authentic, fraudulent practices

d)     Using COLEPS certificate of another Enterprise to submit

16-2 : Essential criteria :

The technical bids will be evaluated according to the following ten (10) main criteria:

a.       Key personnel of the enterprise on three (03) criteria ;

b.       The site equipment to be mobilized on five (05) criteria ;

c.       The Enterprise references on two (02) criteria.

NB: A civil servant without any justification of secondment from the public service will not be evaluated;

15.Attribution New(Additif)

The contract will be awarded to the lowest bidder, fulfilling the required administrative, technical, and financial criteria.

The Delegated Contracting Authority has the discretion not to award the contract to a bidder who has an ongoing contract within the zone, having non satisfactory performances (cancelled or abandoned) or a bit satisfactory (Formal notice with evaluation being unsatisfactory or a notified evaluation of non-compliance within six months of award or contract cancellation underway).

16.Durée Validité des Offres New(Additif)

The bidders remain engaged to their offer within Ninety (90) days from the submission date of the bids

17.Renseignements Complémentaires New(Additif)

Additional information in relation to technical details can be obtained at the office of the Delegated Contracting Authority, notably The Governor of the North West Region.

21. Fight against Corruption and Malpractices

For all reports on practice, acts of corruption or malpractice, you can contact the National Anti-Corruption Agency on 1517, Authority in charge of Public Contracts(MINMAP) (SMS or call) on: (+237) 673 20 57 25 and 699 37 07 48 or the Ministry of Public Works on 88002042.

 

The Governor of the North West Region

(DELEGATED CONTRACTING AUTHORITY)

BAMENDA Le 17-11-2026
Le GOUVERNEUR
LELE LAFRIQUE Adolphe