Système intégré de gestion ouvert et multiplateformes des marchés publics
Publié le 09-01-2025 à 14:27
Support : support@armp.cm Plateforme : pridesoft@armp.cm
COMMUNE DE BUEA
TENDER NOTICE AN OPEN NATIONAL INVITATION TO TENDER No 002/ONIT/BUEA COUNCIL/BCITB/2024 OF  07/01/2025 FORTHE CONSTRUCTION OF CLOSED SHOPS, OPEN STALLS, MODERN TOILET AND THE REHABILITATIONWORKS FOR THE ADMINISTRATIVE BLOCK AT THE CENTRAL MARKET IN BUEA, FAKO DIVISION, SOUTH WESTREGION. (IN EMERGENCY PROCEDURE) FINANCING: FEICOM BUDGET FOR 2024 FINANCIAL YEAR
Source de financement
BUDGET INVESTISSEMENT PUBLIC(BIP)
1.Objet New(Additif)

I e             Subject of the invitation to tender:

Within the framework of FEICOM Budget for 2024, the Mayor Of Buea Council Contracting Authority, hereby launches the Open National Invitation to Tender No 002/ONIT/BUEA COUNCIL/BCITB/2024 OF07/01/2024 07/01/2025 For the construction of closed shops, open stalls, madern toilet and the rehabilitation works for the administrative block at closed shops, open stalls,modern toilet and the rehabilitation works for the administrative block at the Central Market in Buea? FAKO Division. South west R

 

 

2.Consistance des prestations New(Additif)

The works divided on three (03) lots as follows:

Lot 1: Construction of three blocks of 26 closed shops each and finishing works of the block 4 whlch is at the

foundation level,

Lot 2: Construction of two blocks of 72 open stalls each,

Lot 3: Construction of a modem toilet and rehabilitation works for the administrative block.

The works comprise notably:

preliminary works and site installation;

earth works;

foundation;

structure in concrete and masonry;

roofing, roof covering;

tilling;

aluminium, wood and metallic works;

electricity/telephonetair conditioning;

plumbing and sanitary appliances;

painting;

drainage.

2.          Lots

 

Text Box: 5The works divided on three (03) lots as follows:

Lot 1: Construction of three blocks of 26 closed shops each and finishing works of the block 4 which

is at the foundation level,

Lot 2: Construction of two blocks of 72 open stalis each,

Lot 3: Construction of a modem toilet and rehabilitation works for the administrative block.

 

3.Cout Prévisionnel New(Additif)

The estimated cost after preliminary studies is CFA Francsfourhundred and ninety three million eight hundred and twenty one thousand four hundred and five (493,821,405) including taxes and detailed as follows:

Lot N°

Description

Cost estimate

1

Construction of Three Blocks of 26 Closed Shops each and Finishing Works of the Block 4 Which is at the Foundation Level

311,444,629 CFA F

2

Construction of Two Blocks of 72 Open Stails each

146,655,618 CFA F

3

Construction of a Modem Toilet and Rehabilitation Works for the Administrative Block

35,721,159 CFA F

 

Total

493,821,405 CFA F

4.Allotissement New(Additif)

The maximum duration provided by the Project Owner for the execution of the works forming the subject of this invitation to tender is:

Lot N°

Description

Execution duration

1

Construction of Three Blocks of 26 Closed Shops each and Finishing Works of the Block 4 Which is at the Foundation Level

Four (04) months

2

Construction of Two Blocks of 72 Open Stans each

Four (04) months

3

Construction of a Modem Toilet and Rehabilitation Works for the Administrative Block

Four (04) months

5.Participation et origine New(Additif)

Participation in this invitation to tender is open to duly legalized Cameroonian enterprises that fulfil the requirements of the invitation to tender

6.Financement New(Additif)

rehabilitation which form the subject of this invitation to tender shah be financed by FEICOM's Budget 2024 financial year.

7.Consultation du Dossier New(Additif)

The file may be consulted during working hours at the Project and Development Unit of the BUEA Council, Room 213, Tel. +237 677 618 917as soon as this notice is published.

8.Acquisition du Dossier New(Additif)

The file may be obtained from the Project and Development Unit of the Buea Council, Room 213, Tel. +237 677 618 917as soon as this notice is published against payment of the sum of two hundredand fifty thousand (250,000) CFA francs, payable at BUEA Municipal Treasury.

9.Remises des offres New(Additif)

Each bid drafted in English or French in seven (7) copies including the original and six (6) copies marked as such, should reach the Project and Development Unit of the Buea Council, Room 213, Tel. +237 677 618 917not

latex than 04/02/2025 at 12/o'clockand should carry the inscription:

AN OPEN NATIONAL INVITATION TO TENDER No  002/ONIT/BUEA COUNCILIBCITB/2024 OF

 FORTHE CONSTRUCTION 0F CLOSED SHOPS, OPEN STALLS, MODERN TOILET AiVD THE REHABILITATION WORKS FOR THE ADMINISTRATIVE BLOCK AT THE CENTRAL MARKET IN BUEA, FAKO DIVISION, SOUTH WEST REGION(IN EMERGENCY PROCEDURE)

"To be opened only during the bid-opening session"

10.Delai de Livraison New(Additif)

The maximum duration provided by the Project Owner for the execution of the works forming the subject of this invitation to tender is:

Lot N°

Description

Execution duration

1

Construction of Three Blocks of 26 Closed Shops each and Finishing Works of the Block 4 Which is at the Foundation Level

Four (04) months

2

Construction of Two Blocks of 72 Open Stans each

Four (04) months

3

Construction of a Modem Toilet and Rehabilitation Works for the Administrative Block

Four (04) months

11.Cautionnement Provisoire New(Additif)

Text Box: 63

Construction of a Modem Toilet and Rehabilitation Works for the Administrative Block

Seven hundred and fourteen thousand four hundred and twenty-three (714,423) CFA F

 

 

 

The bid bond provide in accordance with the Circular Letter No. 000019/LC!MINMAP of 5thof June 2024 relating to the modalities of constitution, deposit, conservation, restitution and withdrawal of bond on public contracts.

The absence of the bid bond issued by a first-rate bank or financial body of first category authorised by the Minister in charge of Finance to issue bonds for public contracts shall lead to the immediate rejection of the offer. A bid bond submitted but that does not have any relation with the consultation concerned shall be considered as absent. The bid bond presented by a tenderer at the bid opening session shall net be accepted.

12.Recevabilité des Offres New(Additif)

Each bid drafted in English or French in seven (7) copies including the original and six (6) copies marked as such, should reach the Project and Development Unit of the Buea Council, Room 213, Tel. +237 677 618 917not

latex than 04/02/2025 at 12/o'clockand should carry the inscription:

AN OPEN NATIONAL INVITATION TO TENDER No  002/ONIT/BUEA COUNCILIBCITB/2024 OF

  FORTHE CONSTRUCTION 0F CLOSED SHOPS, OPEN STALLS, MODERN TOILET AiVD THE REHABILITATION WORKS FOR THE ADMINISTRATIVE BLOCK AT THE CENTRAL MARKET IN BUEA, FAKO DIVISION, SOUTH WEST REGION(IN EMERGENCY PROCEDURE)

"To be opened only during the bid-opening session"

13.Ouverture des Plis New(Additif)

Text Box: 7The bids shall be openedin a single phase on the 04/02/2024 at 1 pm o’dock local Lime by the

BUEAInternal Tenders Boardin the Conference Hall of the BUEA Council Chamberssituated atBUEATown. Only tenderers may attend this opening session or be represented by a single person of their choice, duly authorised, even in the case of a group of companies.

Under pain of being rejected, the required administrative documents must be submitted in originals or copies certified by the issuing service or the relevant administrative authority, in accordance with the provisions of the Special Regulations of the invitation to tender, They shall be no later than 3 (three) months old from the original deadline for the submission of tenders or must have been issued after the date of signature of the Tender Notice.

In case of absence or non-conformity of a document in the administrative file during the opening of bids, after e 48(forty-eight) hours deadline granted by the Board, the file shall be rejected

14.Critères d'évaluation New(Additif)

The eliminatory criteria are the following:

Absence of bid bond at the opening of bids;

Failure to submit, beyond the 48(forty-eight) hours deadline after the opening of bids, a document of the

administrative file deemed non-compliant or absent (except the bid bond);

False declarations, fraudulent schemes or forged documents;

Failure to comply with 75% essential criteria (75% referring to the qualification threshoid of technical bids);

Absence of the swom statement for net having abandoned contracts during the last three years;

Failure to comply with bids file format;

Absence of a quantified unit phce in the financial offer;

Absence of own or hired minimum equipment;

-        Absence of the site engineer or the environmentalist as technical staff;

-        Absence of an element in the financial offer (submission, Bill of quantities and cost estimate, Schedule of Unit Prices, Sub-detail of Unit Price);

-        Absence of the integrity charter dated and signed;

Absence of the dated and signed commitment statement to comply with environmental and social clauses.

. Essential criteria

The criteria relating to the qualification of candidates are the following:

-        Financial situation

Experience

Personnel

Equipment

Technical proposai (methodology and planning of execution)

N.B.: Non-respect of least at 75% of essential criteria shall entai' rejection of the bid.

15.Attribution New(Additif)

The contract shah be awarded to lowest bidder fulfilling the best technical and financial conditions. 

16.Durée Validité des Offres New(Additif)

Bidders will remain committed to their bids forninety (90) daysfrom the initial deadline set for the submission of bids.

17.Renseignements Complémentaires New(Additif)

Complementary informations may be obtained during working hours from the office of the PROJECT Development Unit Room 213, Buea Council, Tel. +237 677 618 917

BUEA Le 07-01-2025
Le MAYOR
MAFANI David